Media
- a telecommunications line and a medium pressure gas pipeline run through the plots no. 125/3 and 125/9, as well as a ditch and a pipeline
Distance from
- the northern part of the Złotkowo precinct,
- area of the Poznań North junction on the S11 road
Refinement
- the part not covered by the plan has a similar purpose in the study,
- building intensity index - up to 0.5; min. over biologically active - 30%; height of the designed buildings - up to 12 m,
- arable land of class IIIb, IVb, V; class V and VI permanent meadows; land under ditches,
- "Szamotuły" lignite deposits have been identified in the plots,
- a drainage network runs through all plots,