electricity: you need to build a transformer station from scratch (voltage 4-15 kV; available power 0.60 MW)
gas: further expansion is planned in Popowo, currently there is no gas connection, implementation time from the moment of notification: approx. 18 weeks + arrangements with PKP (the gas pipeline should be run under the railroad tracks) from 60 days to half a year
water: yes, the possibility of expanding the network, MPZP provides for a new sewage treatment plant, distance from the connection to the border of the area: approx. 200 m, the nearest water next to residential buildings at ul. Nadbrzeżna, there is a water supply network under the railway tracks from ul. Nadbrzeżna - in order to get to know the details, you can ask the waterworks for issuing conditions for connection to the network
sewage system: no, the possibility of adding a network and building a new sewage treatment plant, the possibility of connecting the sewage system with a pumping station, but the project should be agreed with the PKP, the nearest sewage network from ul. Nadbrzeżna (shallow, approx. 1 m deep), the planned sewage treatment plant, the nearest one located approx. 1 km away
Distance from
distance from:
seaport: 215 km
airports: 55 km to Poznań Ławica
motorways: 45 km
national road: 38 km
railway siding: 3 km
the nearest voivodeship city: Poznań 61 km
Refinement
part of the plot for P / U in the shape of a trapezoid; unfenced plot; undeveloped; access to a municipal road; covered by the arrangements of the applicable local development plan
Possibility to expand the area with real estate located on the other side of the planned road "I KDL"
currently in agricultural use