Media
Electricity: yes
Gas: No.
Water: Water supply to plot no. 3838 is possible from the existing water supply network with a diameter of 110 mm, laid on the way to plot no. 150. After modernizing the water supply facilities of MPECWIK, it will be possible to supply water for domestic purposes in the amount of 0.05 m3 / employee / day. If there is a need for water for purposes other than living, it will be possible to determine the amount of water only at the investor's individual request. The distance between the connection point and the border of the area is 20.0 m
The possibility of connecting to the network is decided by Miejskie Przedsiębiorstwo Energetyki Cieplnej, Wodociągów i Kanalizacji Sp. z o.o. in Środa Wlkp.
Sewerage: Yes (rain sewer)
Telephones: yes
Distance from
Access road to the plot (type of road and its width): From a poviat road - approx. 15 m wide, asphalt
Motorway / national road. A2 motorway - 30 km - exit in Poznań or Września
River and sea ports within 200 km
Railway: Środa Wielkopolska 1 km
Railway siding: Środa Wielkopolska 1 km
The nearest international airport: Poznań Ławica, approx. 40 km
The nearest voivodship city: Poznań, approx. 36 km
Refinement
in part, an insulating green belt, in the location of the 15 kV medium voltage overhead power line along with the functional protection belt until it is moved or wired, in part of the installation sites, warehouses and warehouses and service buildings, in part part of the road, in part overhead location 110 kV power line Kromolice (KRM) - GPZ Środa Wielkopolska (SRO) with a functional protection belt