Media
Electricity: yes
Gas: No.
Water: In order to supply water to plot no. 3825, it will be necessary to build about 300 m of water supply system. MPECWIK is in possession of technical documentation for the construction of the water supply network in question. The construction in question is not included in the multiannual plan for the development and modernization of water supply facilities for 2020-2023.
After the construction of the network in question, it will be possible to provide water for domestic purposes in the amount of 0.05 m3 / employee / day. If there is a need for water for purposes other than living, it will be possible to determine the amount of water only at the investor's individual request.
Sewerage: Yes (rain sewer)
Telephones: no
Distance from
Access road to the area (road type and width): From a district road - approx. 15 m wide, asphalt
Motorway / national road. A2 motorway - 30 km - exit in Poznań or Września
River and sea ports within 200 km
Railway: Środa Wielkopolska 1 km
Railway siding: Środa Wielkopolska 1 km
The nearest international airport: Poznań Ławica, approx. 40 km
The nearest voivodship city: Poznań, approx. 36 km
Refinement
in part, areas of internal roads, in part, areas of production facilities, warehouses and service buildings, in part, areas of public roads - access class roads, in part the location of 15kV medium voltage overhead power line along with the functional protection belt until it is moved or wired, in in parts the location of the 110 kV overhead high voltage power line Kromolice (KRM) - GPZ Środa Wielkopolska (SRO) with a functional protection belt, in part a strip of insulating greenery